Skip to main content
BEAB APPROVED BY INTERTEK (250 PANEL)
Infrared Ceiling Heating for Homes and Businesses

Nothing on the walls. Every room on its own smart thermostat. Slim white PowerBoard panels on the ceiling warm people and everything in the room directly, instead of heating the air first. Supplied and installed across the UK.

Installation Guides

How PowerBoard Panels Are Fitted

The 250W integrated panel screws to the joists like plasterboard, with 8 × 38 mm screws. The 750W surface panel hangs on its bracket, fixed into timber with 50 mm No.10 screws or into masonry with M6 anchors, never into plasterboard alone. Screws are not supplied for either panel.

Book a free remote survey →

10-year warranty · Room-by-room control · No annual servicing

The 250W integrated panel

  • Step 1Mark out the designThe free design sets each panel position from the room's heat loss. The ceiling must be at least 1.8 m high.
  • Step 2Board it inThe 1200 × 600 mm panel fixes to the joists like a sheet of plasterboard, with 8 × 38 mm screws (not supplied). It can also drop into a 600 mm suspended grid.
  • Step 3Connect the leadsEach panel has a pre-fitted lead. Four-way adaptors and link cables join the panels above the ceiling, with one cable back to the room thermostat.
  • Step 4Skim the ceilingThe panel is paper-faced and plaster-ready, so it is skimmed with the rest of the ceiling and nothing shows.
  • Step 5Certify and commissionA qualified electrician connects the circuit, tests and certifies it to BS 7671, and sets up the thermostat.

Ceiling staying put

The 750W surface panel

  • Step 1Mark out the designKeep 50 mm from any surface or light fitting and 300 mm from curtains, shelving or anything that can burn. Avoid the spot directly opposite a large window.
  • Step 2Fix the bracketInto timber joists with 50 mm No.10 screws, every hole on timber, or into masonry with M6 anchors. Never into plasterboard alone. Screws are not supplied.
  • Step 3Hang the panelThe 1195 × 595 × 25 mm panel sits on its bracket with its face at least 2.3 m above the floor. Above 3.5 m we check the design and usually suspend it.
  • Step 4Wire itYour electrician wires the panels to our wiring specification, on a dedicated circuit per zone.
  • Step 5Certify and commissionThe circuit is tested and certified to BS 7671, and the thermostat set up on an internal wall beside the door, 1.2 to 1.5 m up.

Safety

What never to do

  • Never fix into, cut, pierce or trim a panel
  • Never cover a panel, or paint, tape or skim the face of a 750W
  • Never fix a 750W bracket into plasterboard alone
  • Never mount a 750W lower than 2.3 m above the floor

Fitting questions

Where should a 750W surface panel not be fitted?

Not lower than 2.3 m above the floor, not within 300 mm of curtains, shelving or anything that can burn, not directly above or below stored materials, and not directly opposite a large window, where heat is lost through the glass.

Can the 250W integrated panel go in a suspended grid ceiling?

Yes. It can be boarded in and skimmed, dropped into a 600 mm suspended grid, or fixed to the surface of an existing ceiling. It needs a ceiling at least 1.8 m high.

What does the electrician send PoweRad after fitting?

The as-built plan and the electrical certificate, within 30 days of commissioning. The 10-year warranty runs from commissioning.

Can PoweRad find an electrician to fit the panels?

Yes. Use your own qualified electrician, or we can put you in touch with one from our installer network, who prices and invoices the fitting directly.

Need an electrician to fit them?

Use your own, or we put you in touch with one from our installer network. Start with a free design so they know exactly what to fit.